Presentation Title:

Project Server 2010 in Practice – An Introduction

A Case Study at the Australian Communications and Media Authority

Description:

Andre Pinkowski of Single Cell Consulting outlines and demonstrates how the Australian Communications and Media Authority (ACMA) chose Microsoft Project Server 2010 as their EPM Solution, and what their journey was to deploy and implement it.

The details on specific configuration and why those choices were made will be outlined, along with demonstrations on what worked well straight out of the box, what needed customization, and what will still need additional thought and work going into the future.

For those of you who are new to Microsoft’s 2010 EPM Platform, a brief outline of what Project Server 2010 is, and differences to 2007 will be covered as well.

Agenda:

  • Introduction
  • A Brief Introduction to Project Server 2010
  • The Situation at the ACMA Before Project Server
  • Core Project Server Customisations made for the ACMA
  • Resource Management
  • Reporting
  • ACMA’s EPM Roadmap
  • A word from an ACMA’s Staff Member on Project Server
  • Questions

Relevant technical demonstration’s will be given throughout the presentation.