This useful 2007 guide was contributed by a member, Ismet Kocaman for use by the community. He created the document to help Project users with locating the toolbar commands and menu commands in Project 2007 user interface. The guide contains snapshots of the pull-down menus in the menu bar and tooltips for all toolbar buttons. Submenu commands and Dialog Boxes are not included.

We’ve published in PDF for easy download.