Consider the following as structure:

<Adjective><Noun><Verb1><Verb2>
where,
<Adjective> demonstrates degree of maturity
<Noun> demonstrates the End Item
<Verb1> demonstrates the step in the process
<Verb2> demonstrates the final status

For example: <Preliminary><Models and Simulation><Design><Complete>