Thanks Larry, you are always very helpful. It should be in the same web application. I’ll see if I can look over their shoulder to see if we can discover the settings. Good to hear it is possible. All my internet searching was pointing to how to do the reverse of what I was trying to do (make a PWA connected site out of a SharePoint task list)