Is there a good reference or demo that explains how work items in TFS that are tested can show up on a plan as completed?
Hello John —
Have you found the online resources and virtual machine that are available via the Microsoft web site?
http://www.microsoft.com/download/en/details.aspx?id=22267
There are some documents that you can download (top of the download list on the page) that describe how the integration / connector” works, as well as a Hyper-V virtual machine that you can download, install, and play with.
Good luck!
— tz
“