Summary reporting vs. Detailed reporting

Home Forums Discussion Forum Summary reporting vs. Detailed reporting

Viewing 2 reply threads
  • Author
    Posts
    • #4937
      I need to create and maintain a fully resource-loaded MS Project schedule at a detailed level (say planned down to 6 levels), but report with summary information at a less-detailed level (say at level 3, with level 3 containing summary data, down to the individual resource, entered for % complete, work, etc, at the most detailed level).  I don’t have Project Server, although I wonder if that would help.
      I can do this manually by extracting out to Excel, subtotaling there, then copying in to a (separately maintained) MS Project schedule, but that is labor-intensive.  It seems that if it can be done manually with routine procedures, it can be done automatically.
      Has anyone else done this, either with Project or Project Server?
      Christine
    • #6265
      Christine,
      I can try to help but I don’t have enough information to know what you are trying to do.  If you want to send me the plan or a sample I can take a look…

      Hope that helps…Larry
    • #6266
      I took a look at a sample Christine provided and was unable to solve her problem using out of the box functions.  I do think that someone might be able to create a macro for this but that isn’t something I know well enough.  I hope someone else is willing and able to help Christine out.
      Larry Christofaro