I use Project 2016. I’ve noticed that in Text fields (Text1 to Text30), Project filters as if it is case sensitive. For example: If I have two entries that are the same except for case (eg “ABCD” and “abcd”), when I drop down the AutoFilter, it shows only one of them. This seems normal, as it is assuming they are both the same. HOWEVER, when I select it to apply the filter, it then only shows the ones with the SAME case as the one that was shown in the drop-down filter list! I would have thought that case would be ignored in BOTH the AutoFilter drop-down AND what it then displays.
Does anyone know anything about this and if this issue can be solved?