Loading...
Quick Links

CPIGr having no effect on plan-

Home Forums Discussion CPIGr having no effect on plan-

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #342174 Reply

    I am so confused. This is a very simple plan that has three graphical indicators. (Red, Yellow, and green) The formula simply says this:

    If CPI is
    greater or equal to 1 then Green
    equal to .97 then Yellow
    equal to .98 then Yellow
    equal to .99 then Yellow
    less than .97 then Red

    I am showing a red “X” on some of the jobs and I have no red “X’s” checked to use, only red, yellow, and green dots.

    So Frustrating….

    #342191 Reply
    Larry Christofaro
    Participant

    Brian,
    Wow, not sure where that is coming from either. One suggestion that might help is to state if CPI is >= 1 then Green, < .97 then Red, Yellow. It might do a better job of not leaving a number unassigned (like maybe the number .9754867). Can’t help with the “x’s” but I’d be happy to take a look at the schedule if you want. Try posting a picture of the actual formula and graphical indicator criteria I’m sure there’s an answer.

Viewing 2 posts - 1 through 2 (of 2 total)
Reply To: Reply #342191 in CPIGr having no effect on plan-
Your information:




79 − 70 =