Home › Forums › Discussion › Disabling Project Guide causes Gantt Chart to disappear
Tagged: Disable, disappear, Gantt Chart, Microsoft Project 2007, Project Guide, Windows 7
Hi Andrew, I cannot replicate this (Project 2007 and Windows7 64 bit). My project version is 32 bit. I have had lots of issues with the project guide in 2007 after I installed Project 2010 on the same machine, basically using the project guide or any HTML window (Task drivers) caused Project to crash. It was fixed by doing a repair in Programs and features.