Disabling Project Guide causes Gantt Chart to disappear

Home Forums Discussion Disabling Project Guide causes Gantt Chart to disappear

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #4954 Reply
    Community
    Keymaster
    I have an issue with Project Pro 2007 in a Windows 7 64-bit environment, where I turn off the Display Project Guide selection in the Options (Tools-Options-Interface) and then lose all Gantt chart and table displays.
    If I close the Project Guide normally, the above doesn’t happen; only when I turn it off through Options.
    Only came across this in doing UAT where others had changed the default logon details away from corporate standards.  Now I need to close down Project and restart every time to rectify.
    Can anyone help ?
    Andrew
    Brisbane, Australia
    #6416 Reply
    Community
    Keymaster

    Hi Andrew,  I cannot replicate this (Project 2007 and Windows7 64 bit).  My project version is 32 bit.  I have had lots of issues with the project guide in 2007 after I installed Project 2010 on the same machine, basically using the project guide or any HTML window (Task drivers) caused Project to crash.  It was fixed by doing a repair in Programs and features.

Viewing 2 posts - 1 through 2 (of 2 total)
Reply To: Reply #6416 in Disabling Project Guide causes Gantt Chart to disappear