Loading...
Quick Links

MS project 2019 standard to Power BI

Home Forums Discussion MS project 2019 standard to Power BI

  • This topic is empty.
Viewing 1 post (of 1 total)
  • Author
    Posts
  • #483134 Reply
    lestats
    Participant

    Hi,

    I have been trying to integrate the report function from MS project 2019 standard to Power BI since it’s easier to share the KPI of the project via Teams. Moreover, the report feature in Ms poject 2019 it’s not in my opinion as good as in Power BI.
    All the information or tutorials I have found so far are with ProJet online to Power BI.
    I haven’t found anything that showed an easy way to share Project reports via Teams when you are locked with MS project 2019 standard.

    Unfortunately, my new organization has not Project online available yet.
    I was wondering if someone has faced the same challenge as me but was able to use Power BI and MS project 2019 standard together.

    Thanks

Viewing 1 post (of 1 total)
Reply To: MS project 2019 standard to Power BI
Your information:




43 − = 39