Loading...
Quick Links

MS Project and TFS integration pack

Home Forums Discussion MS Project and TFS integration pack

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #2181 Reply
    CommunityCommunity
    Keymaster

    Is there a good reference or demo that explains how work items in TFS that are tested can show up on a plan as completed?

    #6599 Reply
    CommunityCommunity
    Keymaster

    Hello John —

    Have you found the online resources and virtual machine that are available via the Microsoft web site?

    http://www.microsoft.com/download/en/details.aspx?id=22267

    There are some documents that you can download (top of the download list on the page) that describe how the integration / connector” works, as well as a Hyper-V virtual machine that you can download, install, and play with.

    Good luck!

    — tz

     

Viewing 2 posts - 1 through 2 (of 2 total)
Reply To: MS Project and TFS integration pack
Your information:




+ 69 = 78