MS-Project Professional 2016: Duplicate Groups on the ribbon

Home Forums Discussion MS-Project Professional 2016: Duplicate Groups on the ribbon

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #393060 Reply
    Ulhas Samant
    Guest

    I find duplicate groups of commands under tabs like Task in MSP Professional 2016. For example if I have to add a summary task, I find 2 Insert Groups with Summary Task Button. Why there is a similar functionality provided side by side? Are there any changes required in global template etc., to remove this problem?

    Thanks

    #393118 Reply
    Larry Christofaro
    Participant

    Ulhas, I’m not sure what happened or if you are describing out of box features but try this. Go to File / Options, and select the Customize Ribbon tab. On the bottom right there is a Reset / Reset all customizations. Hope this works…

    #393158 Reply
    Ulhas
    Guest

    Thanks a lot. I tried that (reset). It was beneficial only for that session.

    I just used File->Options-> Customize the Ribbon and from the Pane on the Right hand side I removed those groups of commands which appear in duplicate. The problem is solved. The Ribbon does not have duplicate groups. However some groups like Insert are not available for customization. (These experiments I did after uninstalling MSP 2013 from my machine)

    #393167 Reply
    Larry Christofaro
    Participant

    Glad you figured it out, and unfortunately that you had to reinstall. Yes, some of the groups are hard coded because they do more than the (out of box) functionality.