Loading...
Quick Links

Problem building cube in Project 2010

Home Forums Discussion Problem building cube in Project 2010

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #4941 Reply
    Community
    Keymaster

    Hi There,

    I have an issue with a cube build which I am finding difficult to solve, even after a good search on the internet. The nearest I can find is the following post;

    http://blogs.msdn.com/b/brismith/archive/2007/07/16/yet-another-olap-error-message-the-longest-yet.aspx

    Just to be clear the error I get is;

    Errors in the high-level relational engine. A connection could not be made to the data source with the DataSourceID of ‘Project Reporting data source’, Name of ‘Project Reporting data source’

    I have tried to add the Alias to SQL Configuration manager for port 2383 in both the 32 and 64 bit sections, yet I still cannot connect to Analysis Services using the SQL Alias NOR build the project server cube.

    I am totally stumped, can anyone help?

     

    Robert

    #6250 Reply
    Community
    Keymaster

    The odd thing is, I create an Alias on another domain and try and connect to Analysis Services and it connects ok – I dont even need to go near the Configuration Manager to add an alias?

    Robert

     

     

Viewing 2 posts - 1 through 2 (of 2 total)
Reply To: Reply #6250 in Problem building cube in Project 2010
Your information:




+ 75 = 82