Loading...
Quick Links

Project Site Update Failed but not blocking correlation

Home Forums Discussion Project Site Update Failed but not blocking correlation

  • This topic is empty.
Viewing 1 post (of 1 total)
  • Author
    Posts
  • #416913 Reply

    Most of the projects that are set up in our PWA environment (Project Online 2016) receive the error message below for the job type “Project Site Update” (the job state is “Failed but not blocking correlation”). We don’t really use project sites so I’m wondering if it would be better to figure out how to fix the error or to change our settings so that project sites are not created when new projects are set up (and deleting those that have been created) so that we stop getting this error. Any thoughts on the best way to proceed are greatly appreciated. Thank you.

    Queue Job Error Details
    General
    CreateWssSiteContent: Creating project site failed! Project Uid=0d6c69e8-8549-e811-80de-00155df45915, site URL=https://natcenter.sharepoint.com/sites/pwa/WA Spokane County Criminal CFM Study 2018, site name=<customercontent></customercontent>, Site ID=215157fb-6600-44d8-8907-2febbe19e24bCannot attach workspace without either PWSVisibility or PWSManaged feature enabled:
    WSSCreateSiteFailure (16400). Details: id=’16400′
    name=’WSSCreateSiteFailure’
    uid=’14cd43f2-6f1b-ea11-bf77-00155df4ca34′
    projectUID=’0d6c69e8-8549-e811-80de-00155df45915′
    workspaceUrl=’https://natcenter.sharepoint.com/sites/pwa/WA Spokane County Criminal CFM Study 2018/WA Spokane County Criminal CFM Study 2018′
    projectWorkspaceName=’WA Spokane County Criminal CFM Study 2018′
    .
    Queue:
    GeneralQueueJobFailed (26000) – CreateWssSite.CreateWssSiteMessage. Details: id=’26000′
    name=’GeneralQueueJobFailed’
    uid=’15cd43f2-6f1b-ea11-bf77-00155df4ca34′
    JobUID=’830a01f2-6f1b-ea11-bf77-00155df4ca34′
    ComputerName=’0309e62e-3307-4a32-8369-6d9ca90fe781′
    GroupType=’CreateWssSite’
    MessageType=’CreateWssSiteMessage’
    MessageId=’1′
    Stage=”
    CorrelationUID=’722f209f-a098-a000-cb68-4d682c7729ab’
    For more details, check the ULS logs on machine 0309e62e-3307-4a32-8369-6d9ca90fe781 for entries with JobUID 830a01f2-6f1b-ea11-bf77-00155df4ca34.

Viewing 1 post (of 1 total)
Reply To: Project Site Update Failed but not blocking correlation
Your information:




23 − 15 =