Back to ArticlesBack

Join 50,000+ PM Professionals

Get expert PM insights, PMP prep tips, and earn PDUs with exclusive content delivered weekly.

Protected by reCAPTCHA: Privacy & Terms

MPUG - Master Project User GroupMPUG

Remember that time you established a new goal, knowing that a solid plan would help you accomplish it, but not knowing how to start?  Industry-leading software app, Microsoft Project, has many great qualities, but getting your project off the ground may not be one of them. Enter Design Flags: the simple, visual tool that can help you navigate through your project challenges especially when it comes to getting started. Design Flags use recognizable patterns meant for large whiteboards, as well as small desktop icons.

According to PCMag.com, Microsoft Project “doesn’t come with clear tutorials for getting started. It assumes familiarity with both big concepts and fine details of project management” (1). Think of the countless potential Project clients, many of whom already work in a Microsoft house, intrigued by the product, but without the experience to use it. PCMag.com explains, “you really must have a certified project manager on board to drive the software” (1), and unfortunately not every business can make that claim.

Let me introduce you to something adventurous that can help you brainstorm, narrow focus, and chunk projects into steps with concrete objectives. Design Flags are a valuable enhancement tool for project management apps such as Microsoft Project, in more ways than one. Here are six things you can do, using the Design Flags system, to supplement your Project initiatives:

1. Brainstorm with Precision

According to PCMag.com, In Microsoft Project, “for every task, you can enter a lot of detail” (1). But where do you get these details?  A good source is a Design Flag filled out while brainstorming with your team, as different flags are specific to different tasks.

2. Align Tasks and Talent

Mark Stringer, Director of Project Management for Aston Martin, says he uses Project “to allow different people in the business to have their own isolated plan of activities” (2). Design Flags can help you determine which activities are best for which team members.

3. Standardize a Visual Formula

Microsoft reported, in a study of Cardiff University’s implementation of the Project software, “Instead of relying on a variety of systems and methodologies, Cardiff University set out to standardize project management” (3). Design Flags can standardize each step visually, so that you can follow a recognizable formula when adding details in Microsoft Project.

4. Create a Custom Roadmap

In a case study for Brookdale Senior Living Solutions in Tennessee, it was reported that the Project software “supports IT projects, non-IT projects, and strategic road mapping” (4). Design Flags can become a canvas for that roadmap, by visually organizing information that will help your team reach their destination.

5. Give Graphics Premium Parking

Sherweb.com says of Microsoft Project, “team dashboard is crucial… add multiple graphs, charts, data presentations, and other graphics” (5). Any graphic created with Project will need a place to park. Using Design Flags as parking spots will ensure audience engagement with your visuals. These bite-sized compositions, now with additional graphics, will make sure your process is self-explanatory when on display.

6. Tie it all Together

Sally Leathers, Chief Engineer of Aston Martin, says “Microsoft Project is the thing that glues everything together, it really allows us to describe the steps that need to happen” (2). Similarly, the Design Flags technique ensure that nothing falls through the cracks, and that everything is tied together across 16 specific steps called “The Project Grid.”

A review of Microsoft Project on PCMag.com claims that to use the software, “the number of projects your team manages and their level of complexity should be quite high.”  That said, consulting with Design Flags before, during, and even after the Project process will make using the software easier for your team—and easier for your audience to understand when presenting.

Download all 16 Design Flags for free at LohmeyerDesign.com/flags, or order the book WAVE THE FLAG: Project Management with Mr. Lohmeyer’s Design Flags (2017) on Amazon.com. Then, wave your flags loudly, proudly, and persistently… and let me know how these concepts worked for your team!


Photograph credits:
1- Staff, Editorial. “Inspired by Flag Designs.” Westfair Communications, 8 Aug. 2018, westfaironline.com/105567/inspired-by-flag-designs/.
2-Phil Lohmeyer screenshot, 9 Aug. 2018
3- Marchant, Robert. “Greenwich Educator Matches His Passions for Design, Teaching.” GreenwichTime, Greenwich Time, 30 July 2018, www.greenwichtime.com/local/article/Greenwich-educator-matches-his-passions-for-13117775.php#photo-15941379.
4- https://www.greenwichtime.com/local/article/Greenwich-educator-matches-his-passions-for-13117775.php#photo-15941385
5- Lohmeyer, Phillip L. “WAVE THE FLAG: Project Management with Mr. Lohmeyer’s Design Flags (2017)” 9781720915508: Amazon.com: Books.” Amazon.com, CreateSpace, an Amazon Company, 10 July 2018, a.co/5bUArn9.
6-Phil Lohmeyer video screenshot, 24 July 2018.

Article Citations:
(1) Duffy, Jill. “Microsoft Project.” PCMAG, PCMAG.COM, 10 Jan. 2018, www.pcmag.com/review/358181/microsoft-project.
(2) “Customer Stories: Aston Martin” Project Management Software | Microsoft Project, products.office.com/en-us/project/project-customer-stories.
(3) “Customer Stories: Cardiff University” Project Management Software | Microsoft Project, https://query.prod.cms.rt.microsoft.com/cms/api/am/binary/RE1XwvQ
(4) “Customer Stories: Brookdale Senior Living Solutions” Project Management Software | Microsoft Project, https://query.prod.cms.rt.microsoft.com/cms/api/am/binary/RE1z8o0
(5) “7 Microsoft Project Features You Need to Use.” SherWeb, 12 Mar. 2018, www.sherweb.com/blog/o365-7-microsoft-project-features/.

Get Weekly PM Insights

Join 50,000+ PMs receiving updates on the latest PM methodologies, PDU opportunities, tool reviews, career tips, and member exclusives.

Protected by reCAPTCHA: Privacy & Terms

PMI ATP
PMI Authorized Training Partner
REP #4082

Learning Paths

PMP® TrainingCAPM® TrainingPgMP® TrainingPMI-ACP® TrainingMS ProjectMS PlannerMS TeamsJira

PM Resources

PDU TrackerLive WebinarsSalary CalculatorTool ComparisonsJob BoardKnowledge BasePM GlossaryOur Faculty

Community

Discussion ForumStudy GroupsEvents Calendar

Follow Us

LinkedInYouTubeTwitterFacebook
MPUGMaster Project User Group

© 2026 MPUG. All rights reserved.

TermsPrivacySitemapAdvertise
Articles

Wave the Flag for Microsoft Project – 6 Ways Design Flags Can Support your Microsoft Project Initiatives

Remember that time you established a new goal, knowing that a solid plan would help you accomplish it, but not knowing how to start?  Industry-leading software app, Microsoft Project, has […]

4 min read
•about 8 years ago•Updated 9 months ago•
P
Phil LohmeyerAuthor
Project Management
Microsoft Project
Best Practices
Productivity
P
Phil Lohmeyer

Content Writer

Phil Lohmeyer is a Designer, Instructor, Consultant, and Author from Stamford, CT, USA. A Design teacher at Whitby School in Greenwich, CT, Lohmeyer has a passion for storytelling through comic strips and animation, and especially enjoys exploring story structure. He began teaching comic strip clinics in his hometown of Greenwich in 2003, expanding into animation workshops in 2011. Phil enjoys stream-of-consciousness drawing, outlandish premise creation, and creative project management at all levels. Email phil@lohmeyerdesign.com.

View all articles by Phil Lohmeyer
Related Content

Continue Reading

Discover more insights and articles that complement your current reading

A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need
Articles
1 min read

A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need

Part II of the PM Halloween survival guide takes on shape-shifting requirements and dependencies that won’t stay resolved, with practical defenses for each.

A
Anonymous
7 days ago
Read
Context Engineering for Project Managers: Give AI the Project, Not Just the Question
Articles
1 min read

Context Engineering for Project Managers: Give AI the Project, Not Just the Question

Learn how to choose, date, and source the project information you give AI, so its risk analyses, status reports, and change request reviews reflect your actual project.

A
Anonymous
16 days ago
Read
The Climbing Rope – Why Projects Rise or Fall Together
Articles
1 min read

The Climbing Rope – Why Projects Rise or Fall Together

Ronald B. Smith uses a climbing rope to show how project team dynamics like trust, communication, and shared accountability decide who reaches the summit.

A
Anonymous
29 days ago
Read
Explore All Articles