To migrate from PS2007 or start fresh in PS2010

Home Forums Discussion Forum To migrate from PS2007 or start fresh in PS2010

Viewing 1 reply thread
  • Author
    Posts
    • #2163

      Our test migrations have not gone well: Security rights are messed up and our 400+ sharepoint sites each need to be tweeked multiple times. We are considering just leaving PS2007 as is and starting fresh in PS2010. Your thoughts?

    • #6570

      Migration from 2007 shouldn’t be that hard.  You might try to figure out root cause instead of tweaking the issues.  You might be able to figure out how to migrate without the issues you are having.  Sorry, no solution but with 400+ sites (and I assume lots of projects and resources) than migration will be the easier solution…  Larry Christofaro

Viewing 1 reply thread
  • You must be logged in to reply to this topic.